Weed 68: (Oct 3- Oct 10, 2024) Building the Jolley School in Timo
Construction of Jolley School, School
'}}

Recap:

  • Steel reinforcement for concrete floor between Block 5 (Kitchen/Cafeteria), 100%.
  • Electrical work Block 5 hallway 3 & 4, 50%.
  • Pouring concrete parquet flooring, Block 5 (Kitchen/Cafeteria), 60%.
  • Application of paint on walls, 50%
  • Classroom doors installation, 100%
  • Manufacturing student benches/desks, 45%
  • Windows installation

Our operations are currently at the following stages: Wall finishing; Building roofing;  Door and window installation; Electrical installation; Plumbing and fixtures; Painting; and Furnishing.